Results 1 to 13 of 13

Thread: biotech stuff 60 - 80M

  1. #1

    Thread Starter
    Banned
    Join Date
    Mar 2009
    Posts
    764

    biotech stuff 60 - 80M

    in the kneset channel some biotech company guys requested 60-80M$ or NIS, I think it was $, to make new plants or something.

    seriously ?!
    I think that could be done with 300k NIS tops in the case they don't already have labs or employees. for 60-80M of public or, whatever the word is, money, I just hope, the new plant will give the eater super powers, taste good and be considered a full corse meal.

  2. #2
    Super Moderator Shaggy Hiker's Avatar
    Join Date
    Aug 2002
    Location
    Idaho
    Posts
    40,106

    Re: biotech stuff 60 - 80M

    I don't know the NIS-dollars conversion rate, but 300k$ wouldn't buy you much when it comes to biotech. That wouldn't cover staff costs for about a year for even a small biotech firm, which isn't enough time to get out one solid generation of any plant.
    My usual boring signature: Nothing

  3. #3

    Thread Starter
    Banned
    Join Date
    Mar 2009
    Posts
    764

    Re: biotech stuff 60 - 80M

    in the case the employees would get 5 - 51 % of generated net profit as an insentive
    and asuming the employees are choosed according to an objective competision

    2 employees with a little above minimum wage + travel expenses = 2 ( employess) * ( 3500 + 250 ) * 12 (months) * 10 (years) = 900000 NIS
    rented faccility : about 760000 NIS
    equipment ( rented when possible ) = 30000 NIS
    start of marketing product : 5000 tops
    1,695000 NIS much less than 60M$

  4. #4
    Fanatic Member BlindSniper's Avatar
    Join Date
    Jan 2011
    Location
    South Africa
    Posts
    865

    Re: biotech stuff 60 - 80M

    I wouldn't eat any plants engineered by someone on minimum wage

    Useful CodeBank Entries of mine
    Expand Function
    Code Compiler
    Sudoku Solver
    HotKeyHandler Class

    Read this to get Effective help on VBForums
    Hitchhiker's Guide to Getting Help at VBF

  5. #5
    Super Moderator Shaggy Hiker's Avatar
    Join Date
    Aug 2002
    Location
    Idaho
    Posts
    40,106

    Re: biotech stuff 60 - 80M

    Two minimum wage employees? Which one is the manager, or do they draw straws each day?

    That's a pretty bizarre calculation, but even by your own calculation, the cost would be more than 5 times what you initially stated.
    My usual boring signature: Nothing

  6. #6

    Thread Starter
    Banned
    Join Date
    Mar 2009
    Posts
    764

    Re: biotech stuff 60 - 80M

    Quote Originally Posted by Shaggy Hiker View Post
    Two minimum wage employees? Which one is the manager, or do they draw straws each day?

    That's a pretty bizarre calculation, but even by your own calculation, the cost would be more than 5 times what you initially stated.
    true that, but 60M$ seems, to me, wahehey too much.

  7. #7
    PowerPoster techgnome's Avatar
    Join Date
    May 2002
    Posts
    34,687

    Re: biotech stuff 60 - 80M

    Not for a biotech startup... there's a lot of costs involved... especially in equipment... you just don't pop off down to your local electronics store and pick up electron microscopes or gas spectromitors... there's a couple $Mil right there. TWO employees? At a minimum you're going to have 5 scientists, CEO, President, some kind of VP, a couple of secretaries, and a janitor. The janitor you can get at minimum wage, the secretaries are going to need a little more, the executives will command a high salary, and the scientists aren't going to be working for peanuts... Brazilian nuts maybe, but certainly not peanuts. Right there you've burned through probably close to $10M in the first year alone... and that may not even cover operational costs (utilities, rent, etc) ... rent... odds are you're going to need a specialized building with security (security! I forgot about the small army of rent-a-cops needed, 3-per shift, 3 shifts, that's 9, plus they needs days off, so rotating... 12-15) which is going to be another few million... So even at a conservative $5M for construction, we now have burned $15M .... and we haven't even started doing anything yet.

    -tg
    * I don't respond to private (PM) requests for help. It's not conducive to the general learning of others.*
    * I also don't respond to friend requests. Save a few bits and don't bother. I'll just end up rejecting anyways.*
    * How to get EFFECTIVE help: The Hitchhiker's Guide to Getting Help at VBF - Removing eels from your hovercraft *
    * How to Use Parameters * Create Disconnected ADO Recordset Clones * Set your VB6 ActiveX Compatibility * Get rid of those pesky VB Line Numbers * I swear I saved my data, where'd it run off to??? *

  8. #8
    Super Moderator Shaggy Hiker's Avatar
    Join Date
    Aug 2002
    Location
    Idaho
    Posts
    40,106

    Re: biotech stuff 60 - 80M

    Quote Originally Posted by techgnome View Post
    ... there's a lot of costs involved... especially in equipment... you just don't pop off down to your local electronics store and pick up electron microscopes or gas spectromitors... -tg
    Oddly, you can go to e-bay. One of our geneticists was able to pick up some excellent equipment that way. So, somebody out there was sitting around thinking, "I have this gene sequencer here to get rid of. What to do....what to do...."
    My usual boring signature: Nothing

  9. #9

    Thread Starter
    Banned
    Join Date
    Mar 2009
    Posts
    764

    Re: biotech stuff 60 - 80M

    I'm sorry did I say 1,695000 , I meant 100,000 :
    for subsidised experiments at external places and if an inventor solves at his free time whatever they look for he sells it to them for money + % of profits at which point the profits should cover expences.

  10. #10

    Thread Starter
    Banned
    Join Date
    Mar 2009
    Posts
    764

    Re: biotech stuff 60 - 80M

    and another thing,
    what anybody can go to the government and get such fat grants ?
    where is the walkthrough ha ?

  11. #11

    Thread Starter
    Banned
    Join Date
    Mar 2009
    Posts
    764

    Re: biotech stuff 60 - 80M

    I think, 60M$ is enough for a shogun megazord.

  12. #12
    PowerPoster techgnome's Avatar
    Join Date
    May 2002
    Posts
    34,687

    Re: biotech stuff 60 - 80M

    Quote Originally Posted by Shaggy Hiker View Post
    Oddly, you can go to e-bay. One of our geneticists was able to pick up some excellent equipment that way. So, somebody out there was sitting around thinking, "I have this gene sequencer here to get rid of. What to do....what to do...."
    Some how I'm not all that surprised... if a town can sell itself on ebay... why not a gene sequencer ... in fact there's two right now up for grabs... only one accepts returns though... makes you curious...

    -tg
    * I don't respond to private (PM) requests for help. It's not conducive to the general learning of others.*
    * I also don't respond to friend requests. Save a few bits and don't bother. I'll just end up rejecting anyways.*
    * How to get EFFECTIVE help: The Hitchhiker's Guide to Getting Help at VBF - Removing eels from your hovercraft *
    * How to Use Parameters * Create Disconnected ADO Recordset Clones * Set your VB6 ActiveX Compatibility * Get rid of those pesky VB Line Numbers * I swear I saved my data, where'd it run off to??? *

  13. #13
    PowerPoster techgnome's Avatar
    Join Date
    May 2002
    Posts
    34,687

    Re: biotech stuff 60 - 80M

    Quote Originally Posted by moti barski View Post
    I think, 60M$ is enough for a shogun megazord.
    I beg to differ... a Shogun Megazord runs at least $70M

    -tg
    * I don't respond to private (PM) requests for help. It's not conducive to the general learning of others.*
    * I also don't respond to friend requests. Save a few bits and don't bother. I'll just end up rejecting anyways.*
    * How to get EFFECTIVE help: The Hitchhiker's Guide to Getting Help at VBF - Removing eels from your hovercraft *
    * How to Use Parameters * Create Disconnected ADO Recordset Clones * Set your VB6 ActiveX Compatibility * Get rid of those pesky VB Line Numbers * I swear I saved my data, where'd it run off to??? *

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  



Click Here to Expand Forum to Full Width