I have a project where the user has a two week work schedule. Over the 14 days each worker is scheduled for 40 hours. That can be broken up either into 7 11.5 hour shifts, or 10 8 hour shifts. The user wants it to be flexible. So I created the screen below. My problem is the start time fields. If I use a date/time picker it defaults to the current time when the field is NULL. This is confusing to the user and me. I need to have the Start time and hours blank if the person is not scheduled that day. What I would like to do is if the Checkbox is checked there needs to be a valid start time and hours if the checkbox is not checked the control display’s nothing and the Database fields are Null. Has anyone dealt with this kind of problem?


Name:  Operators.jpg
Views: 653
Size:  34.9 KB