I have a worksheet designed as follows:
Column A has the beginning time (say 1:00)
Column B has the stop time (say 2:00)
Column C has the elapsed time (=b1-a1)which in this case is 1:00
My problems is that I want to use the result in Column C to be multiplied (say Rs. 2 per minute). Now when I try to do this it gives me fancy results.
Anybody can help me in this matter
Thanks

[Edited by Rashid Khan on 03-30-2000 at 11:57 AM]