Hi,

I'm having problems with the SourceSafe (6.0) integration add-in in VB6.

I have a project group that contains multiple projects which are all under source control. When I open the project group, always only one project can use the source control functions (check out, check in,...). The others are loaded at projects containing only read-only files. I think (but not sure) that the project that has the SourceSafe functionality is always the one for which the project file (vbp) has the most recent modification date.

Anyone has an idea why not all my projects are provided the source safe functions?

Thanks
Koen